ROOFTOP HYBRID UNDER PM SUYRA GHAR YOJANA

ROOFTOP HYBRID UNDER PM SUYRA GHAR YOJANA

ROOFTOP 3KW HYBRID

ROOFTOP 3KW HYBRID

₹280,000.00

Operose Power Under the PM Surya Ghar: Muft Bijli Yojana, a 3kW hybrid solar plant (which connects to the grid and includes a battery backup for power cuts) typically costs between ₹2,40,000 and ₹2,80,000 before subsidies.

The higher price compared to a standard on-grid system is due to the advanced hybrid inverter and the battery bank. Importantly, the central government subsidy is ₹78,000, which is calculated only on the cost of the solar plant component (batteries are not covered under the subsidy scheme).

The financial breakdown for a 3kW hybrid installation is structured as follows:

💰 Cost and Subsidy Breakdown (3KW Hybrid)

Total Benchmark Cost (Full Installation) ₹2,40,000 to ₹2,80,000
Central Government Subsidy ₹78,000
Panel Brand WAAREE, ADANI, VIKRAM, LOOM, UTL,
Panel Type MonoPERC (550W) /TOPcon (575W – 710W)
Inverter Brand 1 PHASE 24V DURASOL, UTL
LITHIUM BATTERY CAPACITY 100AH 25.6V
LITHIUM BATTERY BRAND DURASOL, UTL
DC WIRE WAACAB, KEI
STRUCTURE Galvanized Iron (GI) C-CHANNEL Structure

 

🛠️ Benefit  a Hybrid System?

  • Zero Power Cut Worries: Unlike standard on-grid systems that shut off during a power outage for safety (anti-islanding), a hybrid system seamlessly switches over to battery backup.
  • Net Metering & Savings: It safely supports net metering. It feeds excess solar power back to the government grid during the day while storing power to run your household’s active 2kW-3kW loads at night.

To apply and hire an authorized installer to guarantee your Direct Benefit Transfer (DBT) credit, log on through the official PM Surya Ghar National Portal.

ROOFTOP 5KW – 5.5KW HYBRID

ROOFTOP 5KW – 5.5KW HYBRID

₹480,000.00

Operose Power Under the PM Surya Ghar: Muft Bijli Yojana, a 5kW-5.5KW hybrid solar plant (which incorporates battery storage alongside a grid connection) usually costs between  ₹4,40,000 to ₹4,80,000 before government incentives. 
The overall cost depends entirely on your battery configuration—specifically whether you opt for standard lead-acid batteries or longer-lasting lithium-ion storage packs. Because the central scheme’s subsidy guidelines cap out at the 3kW mark, a 5KW – 5.5KW hybrid system qualifies for the maximum fixed central subsidy of ₹78,000. The subsidy is calculated purely on the solar modules and inverter components, as batteries do not qualify for government funding. 
💰 Cost and Subsidy Breakdown (5KW Hybrid)
Total Benchmark Cost (Full Installation) ₹4,40,000 to ₹4,80,000
Central Government Subsidy ₹78,000
Panel Brand WAAREE, TATA, ADANI, VIKRAM, LOOM, UTL,
Panel Type TOPcon (575W – 710W)
Inverter Brand 1 PHASE 48V DURASOL, UTL, TATA
LITHIUM BATTERY CAPACITY 100AH 51.2V
LITHIUM BATTERY BRAND DURASOL, UTL, TATA
DC WIRE WAACAB, KEI
STRUCTURE Galvanized Iron (GI) C-CHANNEL Structure
🌟 Advantages of a 5kW Hybrid Setup
  • Uninterrupted Backup: Unlike regular on-grid plants that stop generating power during localized grid breakdowns to prevent safety hazards for utility linesmen, hybrid plants seamlessly partition your house to keep heavy household loads active using combined solar and battery power.
  • Exceptional Energy Output: Generates 20 to 22 units daily (roughly 600–660 units monthly). It easily runs 3 to 4 air conditioners (ACs), water pumps, refrigerators, and lifestyle appliances while feeding extra daytime generation to the state grid via net metering.
  • Space Needed: Requires 400 to 500 square feet of unshaded, clear structural rooftop space to hold the modern high-wattage panels securely.
ROOFTOP 10KW HYBRID

ROOFTOP 10KW HYBRID

₹800,000.00

Under the PM Surya Ghar: Muft Bijli Yojana, a 10KW hybrid solar plant (combining both a grid connection with net metering and a battery bank for power cuts) typically costs between ₹7,20,000 and ₹8,00,000 for a full turnkey installation. 
The price premium over a standard on-grid system is driven entirely by the industrial-grade 3-phase hybrid inverter and the energy storage capacity (batteries). Because the central residential scheme caps financial assistance strictly at the 3kW benchmark, a 10KW hybrid system receives the maximum fixed central subsidy of ₹78,000. Government subsidies are only calculated on the grid-interactive solar modules, as battery modules do not receive direct funding.
💰 Cost and Subsidy Breakdown (10kW Hybrid)
Total Benchmark Cost (Full Installation) ₹7,20,000 to ₹8,00,000
Central Government Subsidy ₹78,000
Panel Brand WAAREE,  ADANI, VIKRAM, LOOM, UTL,
Panel Type TOPcon (575W – 710W)
Inverter Brand 1 PHASE 120V DURASOL, UTL
LITHIUM BATTERY CAPACITY 100AH 120V
LITHIUM BATTERY BRAND DURASOL, UTL
DC WIRE WAACAB, KEI
STRUCTURE Galvanized Iron (GI) C-CHANNEL Structure
🛠️ Key Specifications & Operational Capabilities
  • Massive Power Output: Generates roughly 40 to 50 units per day (about 1,200 to 1,500 units monthly). It easily zeros out substantial residential utility bills while maintaining a massive reserve energy backup.
  • Ideal Appliance Load: Smoothly manages commercial-grade domestic equipment, including 5 to 6 heavy air conditioners (ACs), water pumps (up to 3 HP), central heating infrastructure, luxury kitchen setups, and a dedicated Electric Vehicle (EV) fast-charger.
  • Rooftop Space Required: Requires a dedicated, clear, shadow-free terrace area spanning between 800 and 1,000 square feet.
  • Subsidy Protocol: To lock in the ₹78,000 Direct Benefit Transfer (DBT) credit, you must contract an approved vendor using domestic Indian manufactured (DCR) solar cells registered via the official PM Surya Ghar National Portal.
Most search

Related Projects