ROOFTOP 50KW EPC PROJECT
₹2,200,000.00
A turnkey 50kW On-Grid Solar EPC (Engineering, Procurement, and Construction) project with DCR panels in India costs between ₹20 Lakhs and ₹22 Lakhs for commercial/industrial setups, and Group Housing Societies.
The per-kilowatt cost decreases significantly at this commercial scale due to economies of scale, averaging ₹40,000 to ₹44,000 per kW before localized civil modifications and statutory taxes.
💰 Component 50kW On-Grid EPC
| Project Milestone / Component
|
Detailed Inclusions |
| Solar PV Modules | high-efficiency 600Wp- 750W N-Type TOPCon Bifacial /HJT Panels DCR, BRAND – WAAREE, LOOM, UTL, TATA, ADANI |
| Grid-Tied Inverter Kit | 50kW 3-Phase Industrial String Inverter (BRAND – UTL, LOOM) with remote monitoring |
| Mounting Structures | Hot-Dip Galvanized Iron (HDG) or Aluminium high-wind structural frames |
| Balance of System (BOS) | Fire-resistant AC/DC solar cabling, DCDB/ACDB breaker boxes, earthing pits, and lightning protection |
| DISCOM Liaisoning & Net Metering | State DISCOM approvals, structural validation, net-metering commissioning, and testing |
⚡ Expected Generation & Financial Metrics
- Daily Output: Generates 200 to 220 units per day under clear conditions.
- Monthly Generation: Approximately 6,000 to 6,600 units of clean electricity per month.
- Financial Savings: Saves ₹48,000 to ₹53,000 per month (calculated at a standard commercial utility tariff of ~₹8 per unit).
- Project ROI Payback: 3.5 to 4.5 years. The plant provides completely free operational power for the remaining 20+ years of its certified structural lifespan.
- Space Needed: Requires roughly 4,500 to 5,000 square feet of unshaded rooftop or clear surface topography.
🏛️ Commercial vs. Residential Schemes & Benefits
- Group Housing Societies (GHS/RWA): Under the PM Surya Ghar Yojana, residential complexes installing a 50kW grid-tied system for common loads (elevators, pumps, park lighting) receive a fixed subsidy of ₹9,00,000 (calculated at ₹18,000 per kW).
- Commercial & Industrial (C&I) Units: While commercial enterprises do not receive direct cash subsidies, they can write off up to 40% Accelerated Depreciation under Section 32 of the Income Tax Act in the first year alone, significantly lowering their immediate tax liability.
ROOFTOP 100KW EPC PROJECT
₹4,400,000.00
A turnkey 100kW On-Grid Solar EPC (Engineering, Procurement, and Construction) project with DCR panels in India ranges from ₹40 Lakhs to ₹44 Lakhs for commercial and industrial installations.
At this institutional scale, the pricing benefits from significant economies of scale, bringing the rate down to roughly ₹40,000 to ₹44,000 per kW.
💰 Component 100kW On-Grid EPC
| Project Milestone / Component
|
Detailed Inclusions |
| Solar PV Modules | 136-167 high-efficiency 600Wp- 750W N-Type TOPCon Bifacial /HJT Panels DCR, BRAND – WAAREE, LOOM, UTL, TATA, ADANI |
| Grid-Tied Inverter Kit | 100kW 3-Phase Industrial String Inverter (BRAND- LOOM, UTL, K SOLAR, LUMIOUS) with SCA DA cloud monitoring |
| Mounting Structures | Hot-Dip Galvanized Iron (HDG) or elevated high-wind resistant aluminium structures |
| Balance of System (BOS) | Armoured AC/DC solar cabling, ACDB , DCDB protection boxes, dual surge protection, and chemical earthing pits |
| DISCOM Liaisoning & Net Metering | Factory inspector approvals, CEIG clearance, grid stability testing, and net-metering synchronization |
⚡ Expected Generation & Financial Metrics
- Daily Power Output: Generates 400 to 450 units per day under optimal sunlight conditions.
- Monthly Power Output: Approximately 12,000 to 13,500 units of clean electricity per month.
- Financial Savings: Saves ₹96,000 to ₹1,20,000 per month (based on a typical commercial/industrial tariff of ₹8–₹9 per unit).
- Project Payback Period (ROI): 3 to 4 years. The asset delivers near-zero-cost power for the remaining 25+ years of its linear panel performance warranty.
- Space Requirement: Requires roughly 8,000 to 10,000 square feet of unshaded rooftop, shed, or open floor topography.
🏛️ Financial Incentives & Policy Regulations
- Accelerated Depreciation: Under Section 32 of the Income Tax Act, corporate entities can claim 40% Accelerated Depreciation in the first fiscal year, significantly cutting corporate tax liabilities.
- GST Input Credit: Businesses can recover the GST paid on the solar EPC through the standard Input Tax Credit (ITC) mechanism.
- PM Surya Ghar (GHS/RWA Rule): Direct consumer subsidies do not apply to commercial factories. However, large Group Housing Societies (GHS) or Residential Welfare Associations (RWA) installing 100kW for common grid loads are eligible for a capped central subsidy of ₹78,000 on the system.
ROOFTOP 200KW EPC PROJECT
₹8,700,000.00
A turnkey 200kW On-Grid Solar EPC (Engineering, Procurement, and Construction) project with DCR panels in India ranges between ₹80 Lakhs and ₹87 Lakhs.
At this heavy commercial/industrial scale, costs drop sharply due to substantial volume discounts on core electricals and engineering overheads, averaging an efficient ₹40,000 to ₹43,500 per kW before highly specific civil engineering or long-distance grid evacuation costs.
💰 Component 200kW On-Grid EPC
| Project Milestone / Component
|
Detailed Inclusions |
| Solar PV Modules | 274-334 high-efficiency 600Wp- 750W N-Type TOPCon Bifacial /HJT Panels DCR, BRAND – WAAREE, LOOM, UTL,TATA ADANI |
| Grid-Tied Inverter Kit | 200kW Industrial-grade 3-Phase String Inverters (BRAND- LOOM, UTL, K SOLAR, LUMIOUS) with SCADA cloud monitoring. |
| Mounting Structures | Hot-Dip Galvanized Iron (HDG) or elevated high-wind resistant aluminium structures |
| Balance of System (BOS) | Armoured AC/DC solar cabling, ACDB , DCDB protection boxes, dual surge protection, and chemical earthing pits |
| Liaisoning, CEIG & Net Metering | HT connection checks, CEIG clearance, transformer health verification, and state DISCOM documentation |
⚡ Expected Generation & Financial Metrics
- Daily Power Output: Generates 800 to 900 units per day under clear, optimal sunlight conditions.
- Monthly Power Output: Approximately 24,000 to 27,000 units of clean electricity per month.
- Financial Savings: Saves ₹1.9 Lakhs to ₹2.4 Lakhs per month (assuming a standard commercial/industrial HT tariff of ₹8–₹9 per unit).
- Project Payback Period (ROI): 3.4 to 4.2 years. The system delivers completely free operational power for the remaining 20+ years of its certified performance lifecycle.
- Space Requirement: Requires a substantial clear, shadow-free roof footprint of 17,000 to 20,000 square feet (Metal sheet roofs sit near the lower cost bound, while complex RCC roofs sit near the higher end).
🏛️ Policy, Taxes & Incentives
- No Capital Subsidy: Direct capital subsidies under the PM Surya Ghar Yojana apply strictly to residential homes or common utility loads for Group Housing Societies (capped at 500kW for common areas).
- Corporate Financial Inclusions: Commercial and Industrial (C&I) entities benefit through 40% Accelerated Depreciation tax write-offs in the first fiscal year alongside standard GST Input Tax Credits (ITC).
- The Transformer Constraint: At 200kW, state utility bodies carefully evaluate your local distribution transformer capacity before granting net-metering permission. It is critical to run this technical clearance step first before signing hardware contracts.
ROOFTOP 300KW EPC PROJECT
₹12,900,000.00
A turnkey 300kW On-Grid Solar EPC (Engineering, Procurement, and Construction) project with DCR panels in India ranges from ₹1.17 Crore to ₹1.29 Crore (₹117 Lakhs to ₹129 Lakhs).
At this utility-scale utility connection, aggressive volume purchasing drops the per-kilowatt rate to an efficient ₹39,000 to ₹43,000 per kW, depending heavily on whether the plant is mounted on an industrial metal shed or requires elevated structural engineering on a concrete floor.
💰 Component 300kW On-Grid EPC
| Project Milestone / Component
|
Detailed Inclusions |
| Solar PV Modules | 410-500 high-efficiency 600Wp- 750W N-Type TOPCon Bifacial /HJT Panels DCR, BRAND – WAAREE, LOOM, UTL,TATA ADANI |
| Grid-Tied Inverter Kit | Industrial-grade 3-Phase String Inverters (BRAND- LOOM, UTL, K SOLAR, LUMIOUS) with SCADA cloud monitoring. |
| Mounting Structures | Hot-Dip Galvanized Iron (HDG) or elevated high-wind resistant aluminium structures |
| Balance of System (BOS) | XLPE armored heavy-gauge AC/DC cabling, LT panel structural modifications, ACDB , DCDB protection boxes, dual surge protection, and chemical earthing pits |
| Liaisoning, CEIG & Net Metering | HT connection checks, Chief Electrical Inspector to Government (CEIG) clearance, and DISCOM audits |
⚡ Expected Generation & Financial Metrics
-
- Daily Power Output: Generates 1,200 to 1,350 units per day under optimal, clear sunlight conditions.
- Monthly Power Output: Approximately 36,000 to 40,000 units of clean electricity per month.
- Financial Savings: Saves ₹2.9 Lakhs to ₹3.6 Lakhs per month (assuming a standard commercial/industrial HT tariff of ₹8–₹9 per unit).
- Project Payback Period (ROI): 3.2 to 4 years. The plant provides completely free operational power for the remaining 20+ years of its certified performance lifecycle.
- Space Requirement: Requires a clear, shadow-free roof or ground footprint of 25,000 to 30,000 square feet.
🏛️ Commercial Policy & Operational Regulations
- Corporate Financial Benefits: Commercial and Industrial (C&I) entities benefit aggressively through 40% Accelerated Depreciation tax write-offs in the first fiscal year alongside standard GST Input Tax Credits (ITC). No direct cash subsidy is provided by the government at this commercial scale.
- The HT Net Metering Protocol: At 300kW, installations connect directly to the High Tension (HT) side of the facility. The state DISCOM will require a comprehensive feasibility study of your local distribution transformer and substation capacity before approving net-metering synchronization.
- ALMM Mandate: For commercial entities seeking to comply with strict domestic rules or government-associated power purchase agreements, modules must be selected from the government’s Approved List of Models and Manufacturers (ALMM).
ROOFTOP 500KW EPC PROJECT
₹21,000,000.00
A turnkey 500kW (0.5 MW) On-Grid Solar EPC (Engineering, Procurement, and Construction) project in India ranges from ₹1.90 Crore to ₹2.10 Crore.
At this utility-tied scale, massive volume purchasing drops the per-kilowatt rate to its most efficient residential/commercial benchmark of ₹38,000 to ₹42,000 per KW. The exact price varies depending on whether it is mounted on a manufacturing metal shed, built on a flat concrete roof with high-raised pillars, or set up as a ground-mounted system.
💰 Complete 500KW On-Grid EPC
| Project Milestone / Component
|
Detailed Inclusions |
| Solar PV Modules | 685-834 high-efficiency 600Wp- 750W N-Type TOPCon Bifacial /HJT Panels DCR, BRAND – WAAREE, LOOM, UTL,TATA ADANI |
| Grid-Tied Inverter Kit | Industrial-grade 3-Phase String Inverters (BRAND- LOOM, UTL, K SOLAR, LUMIOUS) with SCADA cloud monitoring. |
| Mounting Structures | Hot-Dip Galvanized Iron (HDG) or elevated high-wind resistant aluminium structures |
| Balance of System (BOS) | Heavy-gauge XLPE armored AC/DC cabling, LT panel modifications, vacuum circuit breakers (VCB), and advanced multi-pit chemical earthing |
| Liaisoning, CEIG & Net Metering | HT connection checks, Chief Electrical Inspector to Government (CEIG) clearance, and DISCOM audits |
⚡ Expected Energy Generation & Financial Returns (ROI)
- Daily Power Output: Generates 2,000 to 2,500 units (kWh) per day under clear sunlight conditions.
- Monthly Power Output: Approximately 60,000 to 75,000 units of clean electricity per month.
- Financial Savings: Saves ₹4.8 Lakhs to ₹6.5 Lakhs per month (assuming a blended commercial/industrial HT tariff of ₹8–₹9 per unit).
- Project Payback Period (ROI): 3.5 to 4.5 years. After capital recovery, the plant yields near-zero cost operational power for the remaining 20+ years of its certified panel performance life.
- Space Requirement: Requires a clean, shadow-free structural layout spanning 40,000 to 50,000 square feet.
🏛️ Commercial Policy, Taxes & Regulatory Benefits
- Accelerated Depreciation: Corporate entities funding a 500kW captive solar asset can claim 40% Accelerated Depreciation under Section 32 of the Income Tax Act in the first financial year. On a ₹2.5 Crore investment, this write-off creates immediate tax protection, lowering the effective out-of-pocket setup cost.
- GST Input Tax Credit (ITC): Enterprises can completely recover the GST paid on their core solar infrastructure through standard Input Tax Credit filing. The Transformer Capacity Constraint: Because a 500kW plant pushes heavy power back onto the local utility, state DISCOMs require an independent technical feasibility audit of your local distribution transformer and substation load profile before granting net-metering permission.
ROOFTOP 1MW (1000KW) EPC PROJECT
₹41,000,000.00
A turnkey 1 Megawatt / 1 MW (1000kW) On-Grid Solar EPC (Engineering, Procurement, and Construction) project with DCR panels in India ranges from ₹3.7 Crore to ₹4.1 Crore.
At this utility-tied industrial scale, exceptional volume leveraging brings the per-kilowatt rate down to its lowest industrial benchmark of ₹37,000 to ₹41,000 per kW. The exact configuration price depends primarily on whether the mega asset is structured as a ground-mounted utility farm or integrated across a massive industrial manufacturing facility’s rooftop layout.
💰 Component 1MW (1000kW) On-Grid EPC Project
| Project Milestone / Component
|
Detailed Inclusions |
| Solar PV Modules | 1370-1667 high-efficiency 600Wp- 750W N-Type TOPCon Bifacial /HJT Panels DCR, BRAND – WAAREE, LOOM, TATA, ADANI |
| Grid-Tied Inverter Kit | Utility-scale Industrial-grade 3-Phase String Inverters (BRAND- LOOM, UTL, K SOLAR, LUMIOUS) with SCADA cloud monitoring. |
| Mounting Structures | Hot-Dip Galvanized Iron (HDG) or elevated high-wind resistant aluminium structures |
| Balance of System (BOS) | Heavy-gauge XLPE armored AC/DC cabling, LT panel modifications, vacuum circuit breakers (VCB), and advanced multi-pit chemical earthing |
| Civil Works & Construction | Module cleaning pipeline infrastructure, shadow-free foundation grading, or concrete deck chemical anchoring |
| Liaisoning, CEIG & Net Metering | HT connection checks, Chief Electrical Inspector to Government (CEIG) clearance, and DISCOM audits |
📈 Expected Energy Generation & Financial Returns (ROI)
-
- Daily Power Output: Generates 4,000 to 4,500 units (kWh) per day under ideal, clear sunlight conditions.
- Annual Power Output: Approximately 14 Lakhs to 16 Lakhs units of clean electricity per year.
- Financial Savings: Saves between ₹9.5 Lakhs and ₹12.5 Lakhs per month (assuming standard commercial/industrial High Tension tariffs of ₹8–₹9 per unit).
- Project Payback Period (ROI): 3.5 to 4.5 years. The asset delivers nearly free captured power to the facility for the remaining 20+ years of its linear performance lifecycle.
- Space Requirement: Requires a clear ground-mount footprint of roughly 4 to 5 acres of flat land, or 80,000 to 1,00,000 square feet of clean, unshaded industrial rooftop space.
🏛️ Commercial Policy, Taxes & Regulatory Benefits
- Accelerated Depreciation: Corporate entities funding a 1000kW captive solar plant can claim 40% Accelerated Depreciation under Section 32 of the Income Tax Act in the first financial year. On a ₹4 Crore investment, this write-off creates massive initial tax protection.
- Open Access Eligibility: If your facility lacks local roof/ground space, a 1000kW plant can be built off-site (third-party or captive solar farm) and the power can be wheeling-routed to your facility through state Open Access Regulations.
- The Substation Bay Constraint: At a 1MW threshold, power evacuation usually moves to high-voltage lines (11kV or 33kV). The state DISCOM requires a strict technical grid-stability audit before issuing your connectivity approval.